It took us longer than we expected to arrive at this point. We just never thought about the layout we wanted, the appliances, the cabinets, budget, etc. It's difficult to set aside time to think about those things while moving, working, growing a baby, eating and sleeping. And since it's a major project with a considerable cost, we want to make sure we met with different contractors, got different prices, options, layouts and whatever. Anyway, we're really excited that we've started!
Today is post #1 and I'll continue to post on the progress of the kitchen project. The thing is supposed to take 4-6 weeks (from the 13th). Today, the appliances arrived (we ordered them early because of a promotion GE was having through September) and I cleaned out the dining room to make way for our temporary kitchen. We'll be without a range/oven for this whole time, so we're planning on crock pot, microwave, George Foreman Grill, and take-out food for a while.
Our future appliances:

Kitchen that will meet Mr. Sledgehammer in a couple of days:

2 comments:
The current kitchen is charming. However I am very excited for you and look forward to seeing the progress as well as the finished project. Maybe one day I will get to come over! :) Love you both. (and Berberz too!)
Hmm, that picture does not do the current kitchen justice. We'll have to add a picture of when the dishwasher is closed, to get a good idea of the color scheme. Charming? Ha!
Post a Comment